





Carhartt Super Dux Insulated Hooded Coat CT105533
Super Dux Insulated Hooded Coat
Carhartt heritage meets technical outdoor performance in this rugged coat that's 35% lighter and has two times the abrasion resistance of traditional duck.
- 8.1-ounce, 97/3 nylon/elastane
- Quilt-lined insulation with 100-grams of 100% polyester 3M Thinsulate
- Rain Defender® durable water repellent
- Wind Fighter® technology tames wind
- Rugged Flex® technology for ease of movement
- Attached adjustable hood with chin guard and locking drawcord closure
- Two-way center front zipper
- Interior pockets with hook and loop closures
- Two lower front pockets with side-entry hand warmers
- Rib knit storm cuffs
- Drop tail hem for added coverage
- Carhartt-strong, triple-stitched main seams
- Carhartt label sewn on left pocket
- Relaxed fit
Price
Color
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Sizing Details
Shipping
More Images
Size Guide

S | M | L | XL | 2XL | 3XL | |
---|---|---|---|---|---|---|
Chest | 34-36 | 38-40 | 42-44 | 46-48 | 50-52 | 54-56 |
Shipping
This item is typically produced within 5 to 7 business days.
Production time is dependent on total order size and time of the year; average production time increases to 7 to 10 business days during the months of November and December.
Transit time is additional and depends on the destination, typically within 5 business days.
The UPS Ground Time-in-Transit Map below provides a full color U.S. map illustrating the typical number of transit days, based on the ship date, for delivery via UPS Ground services. (Last Updated March 2024)
Have a must have in-hands deadline? Reach out to us at Hello@OurWearhouse.com to discuss rush production and/or shipping options and feasability.