





Carhartt Tall Firm Duck Insulated Bib Overalls CTT106672
Tall Firm Duck Insulated Bib Overalls
- 12-ounce, firm hand, 100% ring spun cotton duck canvas
- Quilted nylon lining to waist for easy on and off; 100% polyester insulation to waist for midweight warmth
- Adjustable elastic suspenders
- Multi-compartment bib pocket with zip closure
- Zipper fly
- Two large front pockets
- Hammer loop on right leg
- Seam-to-seam chap-style double-front construction
- Double-layer knees with openings for added knee pads and cleaning out debris
- Ankle-to-thigh leg zippers with storm flaps and snap closures
- Reinforced Cordura® back-leg kick panels
- Two reinforced back pockets
- Metal rivets at vital stress points
- Carhartt-strong, triple-stitched main seams
- Carhartt label sewn on bib pocket
- 33-inch inseam
- Loose fit
Price
Color
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Sizing Details
Shipping
More Images
Size Guide

M (T) | L (T) | XL (T) | 2XL (T) | 3XL (T) | |
---|---|---|---|---|---|
Waist | 41 | 45 | 49 | 53 | 57 |
Shipping
This item is typically produced within 5 to 7 business days.
Production time is dependent on total order size and time of the year; average production time increases to 7 to 10 business days during the months of November and December.
Transit time is additional and depends on the destination, typically within 5 business days.
The UPS Ground Time-in-Transit Map below provides a full color U.S. map illustrating the typical number of transit days, based on the ship date, for delivery via UPS Ground services. (Last Updated March 2024)
Have a must have in-hands deadline? Reach out to us at Hello@OurWearhouse.com to discuss rush production and/or shipping options and feasability.