





Carhartt Ansi 107 Class 3 Hooded Sweatshirt CT104987
Ansi 107 Class 3 Hooded Sweatshirt
Stay seen and stay dry on the site in this high visibility sweatshirt that meets ANSI/ISEA 107 Class 3 standards.
- 10.5-ounce, 100% polyester
- Meets ANSI 107 Class 3, Type R visibility standards
- 3M Scotchlite reflective material segmented for breathability
- Rain Defender® durable water repellent
- Three-piece adjustable hood
- Locker loop
- Hidden media pocket inside right handwarmer pocket
- Stretchable, spandex-reinforced, rib knit cuffs and waistband
- Front handwarmer pocket with flaps for security
- Carhartt label sewn on left handwarmer pocket
- Reflective material maintains performance through 75 home launderings
- Loose fit
Price
Color
Size
Quantity
minimum quantity: x available in bundles of: x Product ordered in bundles.
Sizing Details
Shipping
More Images
Size Guide

S | M | L | XL | 2XL | 3XL | 4XL | |
---|---|---|---|---|---|---|---|
Chest | 34-36 | 38-40 | 42-44 | 46-48 | 50-52 | 54-56 | 58-60 |
Shipping
This item is typically produced within 5 to 7 business days.
Production time is dependent on total order size and time of the year; average production time increases to 7 to 10 business days during the months of November and December.
Transit time is additional and depends on the destination, typically within 5 business days.
The UPS Ground Time-in-Transit Map below provides a full color U.S. map illustrating the typical number of transit days, based on the ship date, for delivery via UPS Ground services. (Last Updated March 2024)
Have a must have in-hands deadline? Reach out to us at Hello@OurWearhouse.com to discuss rush production and/or shipping options and feasability.